Piers and footings for towers, decks, porches and additions. No job is too small to do right.
Get a free estimateTell us your number and we will call you back.
A pier or a footing is a small amount of concrete holding up something that cannot move: a tower, a deck, a porch roof, an addition. Michigan winters push the ground up when it freezes, so footings have to sit below the frost line. Your local building department sets that depth for your address, and a footing set shallower than that is a footing the frost can lift.
Tower bases are a good example of the work. The steel has to stand plumb on a pad that is level and solid enough to carry it for years, with the bolts or anchors set right the first time. We have poured tower pads, and one of our reviews is from a customer whose tower pier we poured while he was in the hospital and could not do it himself. We set the forms, place the steel, pour, and finish the top so whatever comes next sits square.
Before any digging, Michigan law says to call MISS DIG 811 at least three business days ahead so buried lines get marked. If the piers are for a deck or an addition that needs a building permit, the inspector may want to see the holes before the pour, so tell us about the permit up front and we will plan the day around it.
“I cannot recommend Darien Martin / Circle M Concrete enough! I recently had some unexpected health issues and ended up in the hospital, leaving me unable to pour the concrete pier for my tower project. He came over and did the entire job”
Below the frost line, and the exact depth is set by the building department for your address. Ask them, or ask us and we will tell you what your township or city calls for before we dig.
Yes. A single pier or a pad for one tower is a normal job for us. Small jobs are welcome.
Yes. Michigan law requires a call or online ticket to MISS DIG 811 at least three business days before digging, so gas, power and phone lines get marked first. It does not cost you anything.
All concrete can develop hairline cracks over time, but a properly compacted base, steel reinforcement, and correctly placed control joints keep them to a minimum. We take the groundwork seriously so your concrete holds up for the long haul.
Yes. We coat the outside of the walls and lay drain tile around the footings before backfill, so water gets carried away instead of sitting against your basement.
Up to 60 miles from Clare. That covers Mount Pleasant, Midland, Harrison, Gladwin, Alma, Big Rapids, Houghton Lake and everything in between. Estimates are always free with no pressure.
Yes. Stamped concrete is on our card next to patios, sidewalks and driveways. Tell us where it is going and about how big, and we will talk through the pattern and what fits the space.
Yes. Cabin foundations and storage shed pads are regular jobs for us, along with garage and pole barn slabs. Send the size, like 12x16 or 24x30, and we will take a look.
Usually, if it ties into a public road. In Michigan the agency that owns the road issues the driveway permit: the county road commission for county roads, the city or village for its own streets, and MDOT for state highways. We will help you figure out which one is yours.